Specifying Capitalizability of Capital Project WBS Levels
You must specify whether to capitalize or expense each transaction charged to a capital project. The capitalizable classification is similar to the billable classification for transactions charged to a contract project; the task and transaction controls you define determine the default value for this classification.
To specify capitalizability for a capital project WBS level:
1. Decide at which level you want to specify capitalizability and navigate to the appropriate window (See Table 1 - 50 below):

2. Check or uncheck the Capitalizability check box for the task control level you want.
See Also
Creating a Capital Asset in Oracle Projects