However, dependencies do exist between collection plan elements that are context elements and actions. For example, you can only define an "Assign a shop floor status to the intraoperation step" action, if you have added the 'To Operation Sequence' and 'To Intraoperation Step' context elements to your collection plan.
The following table lists these dependencies:
Action To Be Invoked | Context Element(s) Required for Action | |
---|---|---|
Place the job on hold | Job | |
Assign a shop floor status to the intraoperation step | To operation sequence To intraoperation step | |
Hold all schedules building this assembly on this production line | Production Line and Item | |
Assign an ASL status | Supplier | |
Accept the shipment | Inspection Result | |
Reject the shipment | Inspection Result | |
Place the supplier on hold | Supplier | |
Place the PO on hold | Purchase order | |
Table 1 - 8. Action and Collection Plan Element Dependencies |