索引
- Acceptable early days delivery(可接受最早交货天数)
- Acceptable rate changes(可接受比率更改)
- Access level(访问层)
- Alerts(预警)
- Allocation percentage [2](分配百分比 [2])
- Alternate bills, forecasts(替代清单,预测)
- Anchor date [2](停泊日期 [2])
- Append planned orders [2](附加计划订单 [2])
- Assemble-to-order items, forecast control(按订单装配件,预测控制)
- Assembly components, reviewing(装配件组件,复查)
- Assigned to(已指定至)
- Assigning Sourcing Rules and Bills of Distribution(指定来源规则和分配清单)
- Assignment sets(指定集)
- ATP
- Audit Information Report(审计信息报表)
- Auto-reduce MPS(自动冲减 MPS)
- Auto-release planned orders(自动释放计划订单)
- AutoCreate Configuration(自动创建配置)
- Available to promise(可承诺量)
- Average daily demand(日平均需求)
- calculated by kanban planning(通过看板计划计算)
- calculating for kanban items(计算看板项目)
- Backward consumption days [2](反向冲减天数 [2])
- carry forward days(挪前天数)
- copy/merge forecast(复制/合并预测)
- master schedule load options(主计划装入选项)
- Batch mode planner(批模式计划员)
- Bill of distribution, creating a(分配清单,创建)
- Bill of Distribution window(分配清单窗口)
- Creating Bills of Distribution(创建分配清单)
- View bills of distribution(查看分配清单)
- Viewing bills of distribution(查看分配清单)
- Bill of material(物料清单)
- Bill of material attributes(物料清单属性)
- Bill of Material window(物料清单窗口)
- Bill of Materials Parameters window, MPS explosion level(物料清单参数窗口,MPS 展开层)
- Bill of resource, plan organizations(资源清单,计划组织)
- Bill-to address, consume forecasts by(开单目的地地址,冲减预测依据)
- Bills(清单)
- definition, for two-level master scheduling(定义,用于双层主计划)
- multilevel(多层)
- Bills of distribution(分配清单)
- Bills of material, changes to, engineering change planning(物料清单,更改为,工程更改计划)
- Bills, standard(清单,标准)
- Bucket type, display preferences, defining(时段类型,显示参数选择,定义)
- Bucket types(时段类型)
- Buckets(时段)
- forecasting bucket types(预测时段类型)
- reviewing bucketed information(复查分时段信息)
- Build sequence(建立序列)
- Bulk items(散件)
- Buy from(购买处)
- Byproducts(副产品)
- Calculating, kanban size(计算,看板大小)
- Calendar dates, repetitive planning periods [2](日历日期,重复性计划期间 [2])
- Capable to promise, material requirements plans(可承诺能力,物料需求计划)
- Capacity planning(能力计划)
- Capacity problems, identifyiing(能力问题,标识)
- Carry forward days(挪前天数)
- backward consumption days(反向冲减天数)
- copying/merging forecasts(复制/合并预测)
- forward consumption days(正向冲减天数)
- master schedule load options(主计划装入选项)
- master schedules, loading(主计划,装入)
- Change Organization window, organization, changing(更改组织窗口,组织,更改)
- Changing your organization(更改组织)
- Component yield(组件产出率)
- new component usage, calculating(新组件使用,计算)
- Components window, assembly components, reviewing(组件窗口,装配件组件,复查)
- Concurrent manager(并发管理器)
- Configuration(配置)
- consuming predefined(冲减预定义的)
- consuming unique(冲减唯一的)
- forecasting predefined [2](预测预定义的 [2])
- forecasting unique(预测唯一的)
- master schedules, adding to(主计划,添加至)
- Consumption(冲减)
- abnormal demand(异常需求)
- across forecast sets(整个预测集)
- backward consumption days(反向冲减天数)
- deconsumption of forecasts(取消预测的冲减)
- demand classes(需求分类)
- for a product family(用于产品系列)
- forecast level(预测层)
- forecasts [2](预测 [2])
- forecasts and demand classes(预测和需求分类)
- forecasts, by bill-to address(预测,按开单目的地地址)
- forecasts, by customer(预测,按客户)
- forecasts, by demand class(预测,按需求分类)
- forecasts, by item(预测,按项目)
- forecasts, by ship-to address(预测,按发运目的地地址)
- forecasts, effect of master schedule load options on(预测,主计划装入选项的作用)
- forecasts, logic(预测,逻辑)
- forecasts, models(预测,模型)
- forecasts, options(预测,选项)
- forecasts, predefined configurations(预测,预定义的配置)
- forecasts, sales orders in new(预测,新预测中的销售订单)
- forecasts, two-level master scheduling(预测,双层主计划)
- forecasts, unique configurations(预测,唯一配置)
- forecasts, with daily buckets(预测,具有日时段)
- forecasts, with mixed time buckets(预测,具有混合时段)
- forecasts, with periodic buckets(预测,具有定期时段)
- forecasts, with weekly buckets(预测,具有周时段)
- forward consumption days(正向冲减天数)
- master schedules(主计划)
- outlier update percent(异常更新百分比)
- overconsumption(过量冲减)
- predefined configurations(预定义的配置)
- sales orders in new forecasts(新预测中的销售订单)
- unconsumption of forecasts(未冲减预测)
- within a forecast set(在预测集中)
- Contents(目录)
- Copy(复制)
- forecasts(预测)
- generated plans(生成计划)
- Copy/Merge Forecast window, copying/merging forecasts(复制/合并预测窗口,复制/合并预测)
- Copying forecasts(复制预测)
- Copying/merging forecasts(复制/合并预测)
- carry forward days(挪前天数)
- demand class(需求分类)
- overwrite option(改写选项)
- quantity type(数量类型)
- source type(来源类型)
- CRP reports(CRP 报表)
- Current aggregate repetitive schedule(当前总重复性计划)
- Current data(当前数据)
- enterprise view, displaying(企业视图,显示)
- horizontal plan, reviewing(展望期计划,复查)
- reviewing(复查)
- Current Projected On Hand vs Projected Available Graphical Report(当前预计现有量对预计可用图形报表)
- Current repetitive schedule(当前重复性计划)
- Customer, consume forecasts by(客户,冲减预测依据)
- Customers, modelling external customer inventories(客户,模拟外部客户库存)
- Daily buckets, forecast consumption(日时段,预测冲减)
- Date types(日期类型)
- Deconsumption of forecasts(取消预测的冲减)
- Default ABC assignment group(默认 ABC 指定组)
- Default job class, Implementing planned orders(默认任务分类,实施计划订单)
- Default planning parameters, planning parameters, defining(默认计划参数,计划参数,定义)
- Define Bill of Material window, complex bill structures, defining(定义物料清单窗口,复杂清单结构,定义)
- Define Items window, specifying safety stock days(定义项目窗口,指定安全库存天数)
- Define Repetitive Assembly window, repetitive schedule allocation(定义重复装配件窗口,重复性计划分配)
- Defining forecasts (定义预测)
- Deleting(删除)
- forecast sets(预测集)
- forecasts(预测)
- Demand(需求)
- abnormal, consumption of(异常,冲减)
- fields(字段)
- for components, in repetitive planning(用于组件,在重复计划中)
- generating dependent demand, Supply Chain Planning(生成需求相关,供应链计划)
- graphical pegging for an item(项目的图形反查)
- graphs of, generating(图形,生成)
- managing in Supply Chain Planning(供应链计划中的管理)
- netting(求净)
- netting, Supply Chain Planning(求净,供应链计划)
- past due(过期)
- past due, MDS(过期,MDS)
- reviewing details(复查详细资料)
- sales orders, hard reservations(销售订单,硬保留)
- sales orders, soft reservations(销售订单,软保留)
- schedules, in Supply Chain Planning(计划,在供应链计划中)
- spares, in master schedules [2](备件,在主计划中 [2])
- type, defining display preferences(类型,定义显示参数选择)
- types of, in forecast control(类型,在预测控制中)
- types of, in master demand schedules(类型,在主需求计划中)
- Demand Class QuickCodes window, demand classes, creating(需求分类速查代码窗口,需求分类,创建)
- Demand classes(需求分类)
- abnormal demand(异常需求)
- access level(访问层)
- associating(关联)
- forecasts [2](预测 [2])
- master schedules [2] [3](主计划 [2] [3])
- calculating ATP by(计算 ATP 依据)
- code name(代码名称)
- consume by(冲减依据)
- consume forecasts by(冲减预测依据)
- copying/merging forecasts(复制/合并预测)
- creating(创建)
- definition of(定义)
- effective dates(有效日期)
- enabling(启用)
- forecast consumption(预测冲减)
- forecasting with [2](预测 [2])
- master schedule load options(主计划装入选项)
- master scheduling with(主计划)
- net inventory(净库存)
- organizational demand classes(组织需求分类)
- planning with(计划)
- removing or making obsolete(删除或产生报废)
- schedule names, defining(计划名称,定义)
- schedule relief [2](计划冲减 [2])
- supply chain MPS names, defining(供应链 MPS 名称,定义)
- Demand schedule items, planned items options, supply chain plan options(需求计划项目,计划项目选项,供应链计划选项)
- Demand schedule reliefs, tracking for product family(需求计划冲减,跟踪产品系列)
- Demand time fence(需求时间栏)
- Demand time fence control(需求时间栏控制)
- Demand vs. Replenishment Graphical Report(需求对补充图形报表)
- Demand window(需求窗口)
- Derived sales order demand(导出销售订单需求)
- Destinations window, Reviewing destination organizations(目标窗口,复查目标组织)
- Discrete items(离散项目)
- in master schedules(在主计划中)
- inside repetitive assemblies(内部重复装配件)
- planning time fence control, plan options(计划时间栏控制,计划选项)
- planning time fence control, planning parameters(计划时间栏控制,计划参数)
- production plan monitoring(生产计划监控)
- with repetitive components(具有重复组件)
- Discrete jobs(离散任务)
- Displaying an indented bill(显示多级清单)
- Displaying an indented where used(显示各级清单使用处)
- Distribtuion requirements plans(分配需求计划)
- Distribution requirements plan(分配需求计划)
- Distribution requirements planning [2](分配需求计划 [2])
- Distribution requirements plans(分配需求计划)
- Distribution requirments plans, adding firm planned orders for net change replan(分配需求计划,添加固定计划订单以进行净更改重新计划)
- Documents, placing in the Navigator for easy access(单据,放置在浏览器中以方便访问)
- DRP [2]
- Launching the Planning Process(启动计划流程)
- DRP Names window(DRP 名称窗口)
- auto-release(自动释放)
- defining(定义)
- enabling the memory-based planning engine(启用基于内存的计划引擎)
- time fence control(时间栏控制)
- DRP planning methods [2](DRP 计划方法 [2])
- Dynamic lead time, calculation(动态提前期,计算)
- ECO
- Effective dates, demand classes, creating(有效日期,需求分类,创建)
- Effectivity and quantity(有效性及数量)
- End Assemblies window, end assemblies, reviewing(总装窗口,总装,复查)
- End assemblies, reviewing(总装,复查)
- End assembly pegging(总装反查)
- Engineering change order(工程更改订单)
- Engineering Change Order window, engineering change planning(工程更改订单窗口,工程更改计划)
- Engineering change planning(工程更改计划)
- bill of material changes(物料清单更改)
- engineering items(工程项目)
- use-up date(用尽日期)
- Entering forecasts(输入预测)
- Enterprise view(企业视图)
- Establish production forecast(建立生产预测)
- Excel spreadsheets, generating a graph of supply/demand informatino(Excel 电子表格,生成供应/需求信息的图形)
- Exception sets(例外集)
- Exception Summary window, planning exceptions, reviewing [2](例外汇总窗口,计划例外,复查 [2])
- Exception time periods [2](例外时间期 [2])
- Exception time periods options(例外时间期选项)
- excess exceptions(过量例外)
- overpromised exceptions(过度承诺例外)
- repetitive variance exceptions(重复差异例外)
- resource shortage exceptions(资源短缺例外)
- shortage exceptions(短缺例外)
- Exceptions, with capacity utilization(例外,具有能力利用率)
- Exceptions window, sorting data for display(例外窗口,排序数据以显示)
- Excess exceptions, planning exception sets, exceptions time periods(过量例外,计划例外集,例外时间期)
- Excess quantity(过量数量)
- Excess supply in Project MRP(项目 MRP 中的过量供应)
- Execution defaults, planning parameters, defining(执行默认值,计划参数,定义)
- Exploded forecast demand(已展开预测需求)
- Explosion(展开)
- Explosion level(展开层)
- Feedback(反馈)
- Financial Analysis Report(财务分析报表)
- Find Exceptions window, selection criteria, entering(查找例外窗口,选择标准,输入)
- Find Items folder window(查找项目文件夹窗口)
- item planning information, reviewing(项目计划信息,复查)
- supply and demand, reviewing(供应和需求,复查)
- Find Items window, selection criteria, entering(查找项目窗口,选择标准,输入)
- Find Kanban Comparison window(查找看板比较窗口)
- Find Supply/Demand window, selection criteria, entering(查找供应/需求窗口,选择标准,输入)
- Find window(查找窗口)
- navigating through(定位)
- search strings, entering(搜索字符串,输入)
- Firm jobs, implementing planned orders as(固定任务,实施计划订单)
- Firm MRP implemented orders(固定 MRP 已实施的订单)
- Firm MRP planned orders(固定 MRP 计划订单)
- Firm order planning(固定计划订单)
- Firm planned orders(固定计划订单)
- Firm repetitive schedules(固定重复性计划)
- Firm scheduled receipt(固定预定接收)
- Firm scheduled receipts(固定预定接收)
- Firming purchase orders(固定采购订单)
- First bucket days(第一时段天数)
- First horizon(第一限度)
- First unit completion date(第一单位完成日期)
- First unit start date(第一单位起始日期)
- Fixed days supply(固定天数供应)
- Fixed lot multiple(固定批次倍数)
- Fixed order quantity(固定订货数量)
- Flow manufacturing, and kanban planning(流水作业,和看板计划)
- Focus forecast, forecast rules, defining(集中预测,预测规则,定义)
- Focus forecasts(集中预测)
- Folder windows(文件夹窗口)
- Demand(需求)
- Find Exceptions(查找例外)
- Find Items(查找项目)
- Find Supply(查找供应)
- Find Supply/Demand [2](查找供应/需求 [2])
- Forecast Items(预测项目)
- Items(项目)
- Master Demand Schedule Items(主需求计划项目)
- Master Production Schedule Items(主生产计划项目)
- Supply(供应)
- Supply/Demand(供应/需求)
- Folders(文件夹)
- item planning information, reviewing(项目计划信息,复查)
- supply and demand information, reviewing(供应和需求信息,复查)
- Forecast bucketed entries, displaying(预测时段条目,显示)
- Forecast Bucketed Entries window, forecast bucketed entries, displaying(预测时段条目窗口,预测时段条目,显示)
- Forecast Comparison Report(预测比较报表)
- Forecast consumption(预测冲减)
- Forecast control(预测控制)
- assemble-to-order items(按订单装配)
- choosing a value(选择一个值)
- demand, types of(需求,类型)
- derived sales order demand(导出的销售订单需求)
- exploded forecast demand(展开的预测需求)
- for member items(用于组成项目)
- independent forecast demand(独立预测需求)
- item attributes(项目属性)
- pick-to-order items(按订单挑库项目)
- sales order demand(销售订单需求)
- two-level master scheduling processes(双层主计划流程)
- Forecast Detail Report(预测明细报表)
- Forecast entries(预测条目)
- backward consumption days(反向冲减天数)
- carry forward days(挪前天数)
- end date calculation(终止日期计算)
- start date calculation(起始日期计算)
- Forecast Entries window(预测条目窗口)
- defining forecasts(定义预测)
- forecast entries, displaying(预测条目,显示)
- Forecast Items window, defining forecasts(预测项目窗口,定义预测)
- Forecast level(预测层)
- Forecast rules(预测规则)
- Forecast sets(预测集)
- bucket type(时段类型)
- defining(定义)
- deleting(删除)
- generating(生成)
- inheriting defaults(继承默认值)
- overconsumption(过量冲减)
- setting up(设置)
- Forecast Sets window(预测集窗口)
- forecast set, defining manually(预测集,人工定义)
- forecast set, disabling(预测集,禁用)
- forecasts, entering [2](预测,输入 [2])
- Forecasts(预测)
- alerts(预警)
- alternate bills(替代清单)
- AutoCreate Configuration(自动创建配置)
- backward consumption days [2](反向冲减天数 [2])
- bucket type(时段类型)
- consumption(冲减)
- entering forecasts(输入预测)
- bucket type, in consumption [2](时段类型,冲减中 [2])
- bucketed information, reviewing(分时段信息,复查)
- consuming unique(冲减唯一的)
- consumption(冲减)
- two-level master scheduling(双层主计划)
- consumption and master schedule load options(冲减和主计划装入选项)
- consumption by bill-to address(按开单目的地地址冲减)
- consumption by customer(按客户冲减)
- consumption by demand class(按需求分类冲减)
- consumption by item(按项目冲减)
- consumption by ship-to address(按发运目的地地址冲减)
- consumption logic(冲减逻辑)
- consumption of abnormal demand(异常需求的冲减)
- consumption of models(模型的冲减)
- consumption of predefined configurations [2](预定义配置的冲减 [2])
- consumption of sales orders in new forecasts [2](在新预测中销售订单的冲减 [2])
- consumption of unique configurations(唯一配置的冲减)
- consumption options(冲减选项)
- consumption with daily buckets(日时段冲减)
- consumption with demand classes(需求分类冲减)
- consumption with mixed time buckets(混合时段冲减)
- consumption with periodic buckets(定期时段冲减)
- consumption with weekly buckets(周时段冲减)
- consumption, overview(冲减,概览)
- control(控制)
- copy(复制)
- copying(复制)
- deconsumption(取消冲减)
- defining [2](定义 [2])
- deleting(删除)
- demand class, associating(需求分类,关联)
- demand classes [2](需求分类 [2])
- entering(输入)
- entries, backward consumption days(条目,反向冲减天数)
- entries, carry forward days(条目,挪前天数)
- entries, end date calculation(条目,终止日期计算)
- entries, start date calculation(条目,起始日期计算)
- entry options(输入选项)
- establish production forecast(建立生产预测)
- exploded demand(已展开需求)
- exploding from using assemblies(从使用装配件展开)
- exploding to components(展开至组件)
- explosion(展开)
- explosion example(展开实例)
- explosion logic(展开逻辑)
- focus(集中)
- forecast control(预测控制)
- forecast control, choosing a value(预测控制,选择一个值)
- forecast control, derived sales order demand(预测控制,导出的销售订单需求)
- forecast control, exploded forecast demand(预测控制,展开的预测需求)
- forecast control, independent forecast demand(预测控制,独立的预测需求)
- forecast control, item attributes(预测控制,项目属性)
- forecast control, sales order demand(预测控制,销售订单需求)
- forecast control, types of demand(预测控制,需求类型)
- forecast set defaults, inheriting(预测集默认值,继承)
- forecast sets(预测集)
- forward consumption days [2](正向冲减天数 [2])
- generating [2](生成 [2])
- importing from outside sources(自外部来源导入)
- level of detail and consumption(详细资料层和冲减)
- master schedules, generating(主计划,生成)
- merging(合并)
- model bills [2] [3] [4] [5](模型清单 [2] [3] [4] [5])
- open forecast interface(开放预测接口)
- option class bills [2](选项类清单 [2])
- outlier update percent(异常更新百分比)
- overconsumption(过量冲减)
- overview(概览)
- pick-to-order models(按订单挑库模型)
- planning bills [2] [3] [4] [5](计划清单 [2] [3] [4] [5])
- predefined configurations [2](预定义的配置 [2])
- product families(产品系列)
- production forecast, establishing(生产预测,建立)
- quantities, master schedule load options(数量,主计划装入选项)
- re-explosion(重新展开)
- rules(规则)
- rules, defining(规则,定义)
- sets(集)
- sets, bucket type(集,时段类型)
- sets, defining(集,定义)
- sets, deleting(集,删除)
- sets, generating(集,生成)
- sets, inheriting defaults(集,继承默认值)
- sets, overconsumption(集,过量冲减)
- sets, setting up(集,设置)
- setting up(设置)
- simulation(模拟)
- statistical(统计)
- time buckets(时段)
- two-level master scheduling(双层主计划)
- unconsumption(未冲减)
- unique configurations [2](唯一配置 [2])
- using to generate a master schedule(用来生成主计划)
- Formula, for kanban calculation(公式,用于看板计算)
- Forward consumption days [2](正向冲减天数 [2])
- backward consumption days(反向冲减天数)
- Full pegging(完全反查)
- item attributes for(项目属性)
- Generate Forecast window, generating a forecast(生成预测窗口,生成预测)
- Generating(生成)
- forecast sets(预测集)
- forecasts(预测)
- Generating a forecast(生成预测)
- Global sourcing rule(全局来源规则)
- Graphical pegging(图形反查)
- plan options for(计划选项)
- setting up(设置)
- Gross to net explosion(毛需求至净需求展开)
- Hard pegging level(硬反查层)
- Horizontal plan(展望期计划)
- Horizontal Plan window(展望期计划窗口)
- Identifying capacity problems(识别能力问题)
- Implemented quantity, monitoring(已实施的数量,监控)
- Implementing(实施)
- planned orders(计划订单)
- planned orders as firm jobs(作为固定任务的计划订单)
- planning recommendations(计划建议)
- repetitive schedules [2](重复性计划 [2])
- Importing forecasts from outside sources(从外部来源导入预测)
- Include MDS days, planning parameters, defining(包含 MDS 天数,计划参数,定义)
- Included items in DRP, MPS, and MRP(DRP、MPS 和 MRP 中的包括项目)
- Inter-process communication(流程间通信)
- memory-based planning engine(基于内存的计划引擎)
- parallel processing(并行处理)
- Interorg planned orders(组织间计划订单)
- loading supply chain MPS from an internal source(从内部来源装入供应链 MPS)
- master schedules, generating(主计划,生成)
- Inventory ATP, schedule names, defining(库存 ATP,计划名称,定义)
- Inventory planning methods(库存计划方法)
- Item(项目)
- consume forecasts by(冲减预测依据)
- defining project information in item attributes(在项目属性中定义项目信息)
- definition, for two-level for master scheduling(定义,用于双层主计划)
- discrete, and safety stock calculation(离散,和安全库存计算)
- discrete, in a master schedule(离散,主计划中)
- discrete, in master scheduling(离散,主计划中)
- discrete, under planning time fence control(离散,在计划时间栏控制下)
- exception messages(例外信息)
- graphical pegging(图形反查)
- kanban, in auto-release planned orders(看板,在自动释放计划订单中)
- planning information, reviewing(计划信息,复查)
- repetitive, and safety stock calculation(重复,和安全库存计算)
- repetitive, in a master schedule(重复,在主计划中)
- repetitive, in master scheduling(重复,在主计划中)
- repetitive, under planning time fence control(重复,在计划时间栏控制下)
- time fence for, defining(时间栏,定义)
- time fences(时间栏)
- Item attributes(项目属性)
- Item details(项目详细资料)
- Items window(项目窗口)
- assembly components, reviewing(装配件组件,复查)
- current data, reviewing(当前数据,复查)
- end assemblies, reviewing(总装,复查)
- enterprise view, displaying(企业视图,显示)
- firming MRP planned orders(固定 MRP 计划订单)
- graph of planning data, generating(计划数据的图形,生成)
- horizontal plan, reviewing(展望期计划,复查)
- onhand quantities, viewing(现有数量,查看)
- Reviewing destination organizations(复查目标组织)
- Reviewing Item Planning Information(复查项目计划信息)
- Reviewing source organizations(复查来源组织)
- snapshot data, reviewing(快照数据,复查)
- using assemblies, reviewing(使用装配件,复查)
- Job class, default(任务分类,默认)
- Kanban(看板)
- Kanban calculation, viewing(看板计算,查看)
- Kanban calculation program(看板计算程序)
- kanban location(看板地点)
- Kanban Names window [2](看板名称窗口 [2])
- Kanban Parameters window(看板参数窗口)
- Kanban plan, defined(看板计划,已定义)
- Kanban planning(看板计划)
- and demand calculation(和需求计算)
- and order modifiers [2](和订单修改量 [2])
- overview(概览)
- prerequisites(前提条件)
- Kanban size, defined(看板大小,已定义)
- Kanban Workbench window [2](看板工作台窗口 [2])
- Last unit completion date(最后单位完成日期)
- Last unit start date(最后单位起始日期)
- Late Order Report(延迟订单报表)
- Launch Copy Plan window, copying a generated plan(启动复制计划窗口,复制生成的计划)
- Launch DRP window(启动 DRP 窗口)
- Launch Kanban window(启动看板窗口)
- Launch MPS window(启动 MPS 窗口)
- Launch MRP window(启动 MRP 窗口)
- Lead time(提前期)
- dynamic, lead time(动态,提前期)
- lead time calculation, dynamic(提前期计算,动态)
- manufacturing, calculating(制造,计算)
- offset(偏置)
- percent, in time phasing requirements(百分比,在分期需求中)
- repetitive schedule(重复性计划)
- Line priorities(生产线优先级)
- Line speeds(生产线速度)
- Load/Copy/Merge Forecast window, exploding an aggregate forecast for a planning item(装入/复制/合并预测窗口,展开对计划项目的综合预测)
- Load/copy/merge MDS window, master schedule, loading from an internal source(装入/复制/合并 MDS 窗口,主计划,从内部来源装入)
- Load/copy/merge MPS window, master schedule, loading from an internal source(装入/复制/合并 MPS 窗口,主计划,从内部来源装入)
- Loader workers(装载程序工作流程)
- Loading forecasts(装入预测)
- Loading master schedules(装入主计划)
- demand time fence control(需求时间栏控制)
- generating from forecasts(从预测生成)
- sales orders(销售订单)
- time fence control(时间栏控制)
- Local sourcing rule(局部来源规则)
- Locator, for a kanban item(货位,用于看板项目)
- Locking tables within the snapshot, example(锁定快照表,实例)
- Lot expirations(批次过期)
- Lot Multiplier, order modifier(批次倍数,订单修改量)
- Maintain planned orders(维护计划订单)
- Make at(制造位置)
- Manufactured assemblies(制造的装配件)
- Master Demand Schedule Entries window, schedule entries, defining manually(主需求计划条目窗口,计划条目,人工定义)
- Master Demand Schedule Items window, schedule entries, defining manually(主需求计划项目窗口,计划条目,人工定义)
- Master Demand Schedule Reliefs window, relief information, viewing(主需求计划冲减窗口,冲减信息,查看)
- Master demand schedules(主需求计划)
- demand, types of(需求,类型)
- disable, temporarily(禁用,临时)
- discrete items, loading(离散项目,装入)
- entries, defining manually(条目,人工定义)
- interorganization planned orders(组织间计划订单)
- load options(装入选项)
- loading from an internal source(从内部来源装入)
- loading from forecasts(从预测装入)
- loading from source lists(从来源清单装入)
- loading with backward consumption days(使用反向冲减天数装入)
- loading with carry forward days(使用挪前天数装入)
- loading with demand class(使用需求分类装入)
- loading with demand time fence(使用需求时间栏装入)
- loading with interorg planned orders(使用组织间计划订单装入)
- loading with modification percent(使用修改百分比装入)
- loading with outlier update percent(使用异常更新百分比装入)
- loading with overwrite options(使用改写选项装入)
- loading with sales orders [2](使用销售订单装入 [2])
- loading, additional factors affecting(装入,影响的附加因素)
- loading, carry forward days(装入,挪前天数)
- loading, manual entry(装入,人工输入)
- loading, modification percent(装入,修改百分比)
- names, defining(名称,定义)
- names, disabling(名称,禁用)
- past due demand(过期需求)
- profile options for schedule relief(计划冲减的配置文件选项)
- relief information, viewing(冲减信息,查看)
- relief options, defining(冲减选项,定义)
- repetitive items, loading(重复项目,装入)
- schedules, loading from other [2](计划,从其它项目装入 [2])
- shipment relief(发货冲减)
- source flag, tracking entries with(来源标志,跟踪条目)
- spares demand, including [2] [3](备件需求,包括 [2] [3])
- supply chain master demand schedules(供应链主需求计划)
- work dates(工作日期)
- Master Demand Schedules window(主需求计划窗口)
- enabling the memory-based planning engine(启用基于内存的计划引擎)
- schedule entries, defining manually(计划条目,人工定义)
- schedule names, defining(计划名称,定义)
- schedule names, disabling(计划名称,禁用)
- Master Item window(主项目窗口)
- defining project information in item attributes(在项目属性中定义项目信息)
- time fence control(时间栏控制)
- Master Production Schedule Entries window, schedule entries, defining manually(主生产计划条目窗口,计划条目,人工定义)
- Master Production Schedule Items window(主生产计划项目窗口)
- Master Production Schedule Reliefs window, relief information, viewing(主生产计划冲减窗口,冲减信息,查看)
- Master production schedules [2](主生产计划 [2])
- append planned orders(附加计划订单)
- auto-reduce(自动缩减)
- auto-release planned orders(自动释放计划订单)
- disable, temporarily(禁用,临时)
- discrete items, loading(离散项目,装入)
- entries for product family items(产品系列项目的条目)
- entries, defining a supply chain MPS manually(条目,人工定义供应链 MPS)
- entries, defining manually(条目,人工定义)
- explosion level(展开层)
- feedback, defining schedule names(反馈,定义计划名称)
- implemented quantity, monitoring(已实施数量,监控)
- inventory ATP, defining MPS names(库存 ATP,定义 MPS 名称)
- launching a plan(启动计划)
- launching a Project MRP plan(启动项目 MRP 计划)
- launching a supply chain plan(启动供应链计划)
- load options(装入选项)
- loading from an internal source(从内部来源装入)
- loading from forecasts(从预测装入)
- loading from source lists(从来源清单装入)
- loading with backward consumption days(使用反向冲减天数装入)
- loading with carry forward days(使用挪前天数装入)
- loading with demand class(使用需求分类装入)
- loading with demand time fence(使用需求时间栏装入)
- loading with interorg planned orders(使用组织间计划订单装入)
- loading with modification percent(使用修改百分比装入)
- loading with outlier update percent(使用异常更新百分比装入)
- loading with overwrite options(使用改写选项装入)
- loading with sales orders [2](使用销售订单装入 [2])
- loading, additional factors affecting(装入,影响的附加因素)
- loading, carry forward days(装入,挪前天数)
- loading, manual entry(装入,人工输入)
- loading, modification percent(装入,修改百分比)
- maintaining(维护)
- maintaining, with demand time fence(维护,使用需求时间栏)
- maintaining, with planning time fence(维护,使用计划时间栏)
- MPS and DRP planning methods(MPS 和 DRP 计划方法)
- MPS firm planned orders, adding(MPS 固定计划订单,添加)
- names, defining(名称,定义)
- names, disabling(名称,禁用)
- plan generation(计划生成)
- plan options, reviewing or adding(计划选项,复查或添加)
- plan options, reviewing or adding in Project MRP [2](计划选项,在项目 MRP 中复查或添加 [2])
- plan options, reviewing or adding in Supply Chain Planning(计划选项,在供应链计划中复查或添加)
- planning(计划)
- planning logic(计划逻辑)
- plans, copying(计划,复制)
- production relief(生产冲减)
- phantoms(虚拟件)
- repetitive items(重复项目)
- profile options for schedule relief(计划冲减的配置文件选项)
- relief information, viewing(冲减信息,查看)
- relief options, defining(冲减选项,定义)
- relief process(冲减流程)
- relief process, reporting by exception(冲减流程,按例外报告)
- repetitive items, loading(重复项目,装入)
- schedules, loading from other(计划,从其它项目装入)
- source flag, tracking entries with(来源标志,跟踪条目)
- spares demand, including [2] [3](备件需求,包括 [2] [3])
- supply chain master production schedules(供应链主生产计划)
- work dates(工作日期)
- Master Production Schedules window(主生产计划窗口)
- Master production scheduling, MPS planning methods(主生产计划,MPS 计划方法)
- Master Schedule Comparison Report(主计划比较报表)
- Master Schedule Detail Report(主计划明细报表)
- Master Schedule Status Report(主计划状态报表)
- Master schedules [2] [3] [4](主计划 [2] [3] [4])
- configurations, adding(配置,添加)
- copying generated plans(复制生成的计划)
- demand class, associating(需求分类,关联)
- deriving from an existing schedule(从现存计划导出)
- disable, temporarily(禁用,临时)
- discrete items, loading(离散项目,装入)
- entries, defining manually(条目,人工定义)
- entries, defining manually in Supply Chain Planning(条目,在供应链计划中人工定义)
- forecasts, generating from(预测,生成自)
- generating from forecasts(从预测生成)
- interorg planned orders, loading with(组织间计划订单,装入)
- load options(装入选项)
- loading a supply chain MPS from an internal source(从内部来源装入供应链 MPS)
- loading from an internal source(从内部来源装入)
- loading from forecasts(从预测装入)
- loading from lists(从清单装入)
- loading from multiple sources(从多个来源装入)
- loading from outside sources(从外部来源装入)
- loading sales orders(装入销售订单)
- loading with backward consumption days(使用反向冲减天数装入)
- loading with carry forward days(使用挪前天数装入)
- loading with demand class(使用需求分类装入)
- loading with demand time fence(使用需求时间栏装入)
- loading with interorg planned orders [2](使用组织间计划订单装入 [2])
- loading with modification percent(使用修改百分比装入)
- loading with outlier update percent(使用异常更新百分比装入)
- loading with overwrite options(使用改写选项装入)
- loading with sales orders [2](使用销售订单装入 [2])
- loading, additional factors affecting(装入,影响的附加因素)
- loading, manual entry(装入,人工输入)
- loading, modification percent [2](装入,修改百分比 [2])
- maintaining(维护)
- manual entry, supply chain MPS(人工输入,供应链 MPS)
- MPS and DRP planning methods(MPS 和 DRP 计划方法)
- names, defining(名称,定义)
- names, disabling(名称,禁用)
- planning manager(计划管理器)
- planning process(计划流程)
- production relief(生产冲减)
- phantoms(虚拟件)
- repetitive items(重复项目)
- relief information, viewing(冲减信息,查看)
- relief options, defining(冲减选项,定义)
- relief profile options(冲减配置文件选项)
- repetitive assembly(重复装配件)
- repetitive items, loading(重复项目,装入)
- sales orders, loading with(销售订单,装入)
- schedules, loading from other(计划,从其它项目装入)
- shipment relief(发货冲减)
- source flag, tracking entries with(来源标志,跟踪条目)
- source lists, generating from(来源清单,生成自)
- source type(来源类型)
- spares demand, including [2](备件需求,包括 [2])
- supply chain master schedules(供应链主计划)
- Supply Chain Planning(供应链计划)
- types(类型)
- work dates(工作日期)
- Master scheduling [2] [3] [4](主计划 [2] [3] [4])
- applications of(应用)
- demand class, associating(需求分类,关联)
- demand classes, with(需求分类,使用)
- discrete items(离散项目)
- main features(主要特性)
- MPS planning methods(MPS 计划方法)
- of planning models, option classes, and product families(计划模型,选项类,和产品系列)
- repetitive items(重复项目)
- rough-cut capacity planning, use of(粗略能力计划,使用)
- supply chain master schedules(供应链主计划)
- two-level(双层)
- Material planners, defining(物料计划员,定义)
- Material requirements plan, snapshot lock tables(物料需求计划,快照加锁表)
- Material Requirements Planning(物料需求计划)
- Material requirements plans [2] [3](物料需求计划 [2] [3])
- acceptable early days delivery(可接受最早交货天数)
- anchor date(停泊日期)
- append planned orders, in overwrite options(附加计划订单,改写选项中)
- ATP information(ATP 信息)
- auto-release planned orders(自动释放计划订单)
- auto-release repetitive schedules(自动释放重复性计划)
- bill of material attributes(物料清单属性)
- bill of material changes(物料清单更改)
- bulk item(散件)
- component yield(组件产出率)
- CTP information(CTP 信息)
- demand, past due(需求,过期)
- dynamic lead time, calculating(动态提前期,计算)
- engineering change orders(工程更改订单)
- engineering change planning(工程更改计划)
- engineering items(工程项目)
- feedback, defining MRP names(反馈,定义 MRP 名称)
- feedback, defining supply chain MRP names(反馈,定义供应链 MRP 名称)
- firm MRP implemented orders(固定 MRP 已实施的订单)
- firm order planning [2](固定计划订单 [2])
- firm scheduled receipts(固定预定接收)
- generating(生成)
- generating in Supply Chain Planning(在供应链计划中生成)
- gross to net explosion(毛需求至净需求展开)
- implemented quantity, monitoring(已实施的数量,监控)
- included items in a supply chain MRP plan(供应链 MRP 计划中包括的项目)
- inventory planning methods(库存计划方法)
- item attributes(项目属性)
- item attributes and recommendations, table of(项目属性和建议,表)
- launching a Project MRP plan(启动项目 MRP 计划)
- launching a supply chain plan(启动供应链计划)
- launching an plan(启动计划)
- lead time calculation, dynamic(提前期计算,动态)
- lead time offset(提前期偏置)
- lead time percent(提前期百分比)
- lot expirations(批次过期)
- manufactured assemblies(制造的装配件)
- manufacturing lead time, calculating(制造提前期,计算)
- material scheduling method(物料计划方法)
- MRP and DRP planning methods(MRP 和 DRP 计划方法)
- MRP plan generation in supply chain planning(供应链计划中的 MRP 计划生成)
- MRP planning methods(MRP 计划方法)
- MRP planning methods, in Inventory(MRP 计划方法,库存中)
- MRP planning methods, Supply Chain Planning(MRP 计划方法,供应链计划)
- names, defining [2](名称,定义 [2])
- names, defining in Supply Chain Planning(名称,在供应链计划中定义)
- names, disabling(名称,禁用)
- net purchases(净采购)
- net reservations(净保留)
- net subinventories(净子库存)
- net WIP(净 WIP)
- netting supply and demand(求净供应和需求)
- onhand quantities, viewing(现有数量,查看)
- order modifiers(订单修改量)
- organization selection, Supply Chain Planning(组织选择,供应链计划)
- overwrite all, append planned orders, in overwrite options(全部改写,附加计划订单,在改写选项中)
- overwrite none, append planned orders, in overwrite options(无改写,附加计划订单,在改写选项中)
- overwrite options(改写选项)
- overwrite outside planning time fence, append planned orders, in overwrite options(改写外协计划时间栏,附加计划订单,在改写选项中)
- phantom bills(虚拟件清单)
- plan options, reviewing or adding(计划选项,复查或添加)
- plan options, reviewing or adding in Project MRP [2](计划选项,在项目 MRP 中复查或添加 [2])
- plan options, reviewing or adding in Supply Chain Planning(计划选项,在供应链计划中复查或添加)
- planning logic(计划逻辑)
- planning logic, Supply Chain Planning(计划逻辑,供应链计划)
- planning process, phases of under memory-based planning engine(计划流程,基于内存的计划引擎下的阶段)
- plans, copying [2](计划,复制 [2])
- purchased assemblies(采购装配件)
- rescheduling non-standard discrete jobs(重新计划非标准离散任务)
- safety stock(安全库存)
- safety stock, Inventory calculation methods(安全库存,库存计算方法)
- safety stock, MRP calculation methods(安全库存,MRP 计算方法)
- shrinkage rate(损耗率)
- snapshot, memory-based planning engine(快照,基于内存的计划引擎)
- specifying items to include in plans(指定要包括在计划中的项目)
- standard bills(标准清单)
- standard routings(标准工艺路线)
- supply chain MRP(供应链 MRP)
- supply, past due(供应,过期)
- time fence control(时间栏控制)
- demand(需求)
- planning(计划)
- release(释放)
- time phasing requirements(分期需求)
- use-up date(用尽日期)
- Material scheduling method [2] [3](物料计划方法 [2] [3])
- example(实例)
- lead time percent(提前期百分比)
- plan options(计划选项)
- planning parameters(计划参数)
- time phasing requirements(分期需求)
- Material scheduling method options(物料计划方法选项)
- Maximum order quantity(最大订货数量)
- MDS
- MDS Entries window, schedule entries, defining manually(MDS 条目窗口,计划条目,人工定义)
- MDS Items window, schedule entries, defining manually(MDS 项目窗口,计划条目,人工定义)
- MDS Names window(MDS 名称窗口)
- enabling the memory-based planning engine(启用基于内存的计划引擎)
- schedule entries, defining manually(计划条目,人工定义)
- schedule names, defining(计划名称,定义)
- schedule names, disabling(计划名称,禁用)
- MDS Reliefs window, relief information, viewing(MDS 冲减窗口,冲减信息,查看)
- Memory-based planner [2] [3](基于内存的计划员 [2] [3])
- Memory-based planning engine(基于内存的计划引擎)
- Memory-based snapshot(基于内存的快照)
- Menu paths(菜单路径)
- Merging forecasts(合并预测)
- Messages, planning manager, starting(信息,计划管理器,启动)
- Min-max planning(最小 - 最大计划)
- Minimum order quantity(最小订货数量)
- Model bill forecast [2] [3](模型清单预测 [2] [3])
- Model bills(模型清单)
- forecasts(预测)
- two-level master scheduling(双层主计划)
- Modification percent(修改百分比)
- master schedule load options(主计划装入选项)
- master schedules, loading(主计划,装入)
- Monitoring the production plan(监控生产计划)
- MPS [2]
- MPS and DRP planning methods(MPS 和 DRP 计划方法)
- MPS Entries window, schedule entries, defining manually(MPS 条目窗口,计划条目,人工定义)
- MPS explosion level(MPS 展开层)
- master schedule load options(主计划装入选项)
- MPS Item window, supply chain MPS entries, defining manually(MPS 项目窗口,供应链 MPS 条目,人工定义)
- MPS Items window(MPS 项目窗口)
- MPS Names window(MPS 名称窗口)
- MPS planning methods(MPS 计划方法)
- MPS Reliefs window, relief information, viewing(MPS 冲减窗口,冲减信息,查看)
- MRP [2]
- MRP and DRP planning methods(MRP 和 DRP 计划方法)
- MRP Names window(MRP 名称窗口)
- MRP planning methods [2](MRP 计划方法 [2])
- Supply Chain Planning(供应链计划)
- MRP:Consume MDS(MRP:冲减 MDS)
- MRP:Consume MPS(MRP:冲减 MPS)
- MRP:Cutoff Date Offset Months(MRP:截止日期偏置月数)
- MRP:Environment Variable to Set Path for MRP Files(MRP:设置 MRP 文件路径的可变环境)
- MRP:Firm Planned Order Time Fence [2](MRP:固定计划订单的时间栏 [2])
- MRP:MPS Relief Direction(MRP:MPS 冲减方向)
- MRP:Planner Workers(MRP:计划员工作流程)
- MRP:Planning Manager Batch Size(MRP:计划管理器批大小)
- MRP:Planning Manager Workers(MRP:计划管理器工作流程)
- MRP:Snapshot Pause for Lock(MRP:快照暂停以锁定)
- MRP:Snapshot Workers(MRP:快照工作流程)
- MRP:Time Fence Warning(MRP:时间栏警告)
- MRP:Use Direct Load Option(MRP:使用直接装入选项)
- Multilevel pegging(多层反查)
- Multiple organizations(多个组织)
- Navigator, placing documents in(浏览器,将单据置于)
- Navigator paths(浏览器路径)
- Negative requirements(负需求)
- Negative usage(负使用)
- Net change replan(净更改重新计划)
- Net change simulation [2](净更改模拟 [2])
- Net purchases [2] [3](净采购 [2] [3])
- assigning a location to the inventory organization(将地点指定至库存组织)
- internal requistions(内部请购单)
- plan options(计划选项)
- plan organizations(计划组织)
- planning dates(计划日期)
- receiving inspection inventory(入库检验库存)
- Net reservations(净保留)
- hard reservations(硬保留)
- plan options(计划选项)
- plan options, Supply Chain Planning(计划选项,供应链计划)
- plan organizations(计划组织)
- plan organizations, Supply Chain Planning [2](计划组织,供应链计划 [2])
- planning parameters(计划参数)
- soft reservations(软保留)
- Net subinventories(净子库存)
- Net subinventory, demand class, by(净子库存,需求分类,按)
- Net WIP(净 WIP)
- Netting supply and demand(求净供应和需求)
- Object navigator(对象浏览器)
- full pegging(完全反查)
- Viewing bills of distribution(查看分配清单)
- Onhand quantities, viewing(现有数量,查看)
- Online planner(联机计划员)
- Online Planner Status window, replanning net changes(联机计划员状态窗口,重新计划净更改)
- Open forecast interface(打开预测接口)
- Operation start date(工序起始日期)
- Option class bill forecast [2](选项类清单预测 [2])
- Order modifiers(订单修改量)
- Order Reschedule Report(订单重新计划报表)
- Order start date(订单起始日期)
- Organization, changing(组织,更改)
- Organization Parameters window, defining project information in organization paramters(组织参数窗口,定义组织参数中的项目信息)
- Outlier update percent(异常更新百分比)
- master schedule load options(主计划装入选项)
- Over-utilization(高于利用率)
- Overconsumption of forecasts(预测的过量冲减)
- Overpromised exceptions, planning exception sets, exception time periods(过度承诺例外,计划例外集,例外时间期)
- Overrun percent(过剩百分比)
- Overwrite none, do not append planned orders(无改写,未附加计划订单)
- Overwrite option(改写选项)
- Overwrite outside planning time fence, append planned orders(改写外协计划时间栏,附加计划订单)
- Parallel processing(并行处理)
- concurrent manager(并发管理器)
- determing the number of processes to launch(确定要启动的流程数)
- interprocess communication(流程间通信)
- planner, setting up(计划员,设置)
- planning manager(计划管理器)
- process control(流程控制)
- read consistency(读一致性)
- single processor machine(单处理器设备)
- snapshot(快照)
- snapshot process logic(快照流程逻辑)
- snapshot tasks(快照任务)
- snapshot worker process logic(快照工作流程逻辑)
- Parallel processing in the Memory-based Snapshot [2](基于内存的快照中的并行处理 [2])
- Parameters window(参数窗口)
- Pegging(反查)
- hard(硬)
- plan options for(计划选项)
- soft(软)
- Periodic buckets, forecast consumption(定期时段,预测冲减)
- Personal profile options(个人配置文件选项)
- Phantom bills of material(虚拟件物料清单)
- Phantoms, production relief(虚拟件,生产冲减)
- Pick-to-order items, forecast control(按订单挑库项目,预测控制)
- Pick-to-order model forecasts(按订单挑库模型预测)
- Placing documents in the Navigator(将单据置于浏览器中)
- Plan capacity(计划能力)
- Plan control(计划控制)
- Plan generation(计划生成)
- Plan options(计划选项)
- Plan Options window(计划选项窗口)
- coordinate records with Subinventory Netting window(使用子库存净数窗口协调记录)
- Supply Chain Planning(供应链计划)
- netting subinventories(求净子库存)
- netting supply and demand, Supply Chain Planning(求净供应和需求,供应链计划)
- overriding default options for individual plans(改写个别计划的默认选项)
- reviewing or adding plan options(复查或添加计划选项)
- reviewing or adding plan options in Supply Chain Planning(复查或添加供应链计划中的计划选项)
- reviewing or adding project MRP plan options(复查或添加项目 MRP 计划选项)
- safety stock, calculating(安全库存,计算)
- specifying items for the supply chain planning process(指定供应链计划流程的项目)
- time fence control(时间栏控制)
- Plan organizations(计划组织)
- bill of resource(资源清单)
- net purchases(净采购)
- net reservations(净保留)
- net WIP(净 WIP)
- netting subinventories(求净子库存)
- plan safety stock(计划安全库存)
- simulation set(模拟集)
- Plan Organizations window(计划组织窗口)
- netting subinventories(求净子库存)
- Netting Supply and Demand(求净供应和需求)
- plan options, reviewing or adding to organizations(计划选项,复查或添加至组织)
- Plan safety stock(计划安全库存)
- plan options, reviewing or adding(计划选项,复查或添加)
- plan organizations(计划组织)
- planning parameters, defining(计划参数,定义)
- Plan Status window(计划状态窗口)
- Planned items(计划项目)
- Planned Items option, compare effect on DRP, MPS, and MRP(计划项目选项,比较对 DRP、MPS 和 MRP 的影响)
- Planned items options(计划项目选项)
- Planned Order Report(计划订单报表)
- Planned orders(计划订单)
- Planner(计划员)
- Planner delete worker(计划员删除工作流程)
- Planner Workbench(计划员工作台)
- assembly components, reviewing(装配件组件,复查)
- batch mode planner(批方式计划员)
- calendar periods used by(使用的日历期间)
- current data, reviewing(当前数据,复查)
- demand fields(需求字段)
- demand, managing in Supply Chain Planning(需求,在供应链计划中管理)
- end assemblies, reviewing(总装,复查)
- end assembly pegging(总装反查)
- enterprise view, displaying(企业视图,显示)
- exception sets(例外集)
- firm planned orders, creating(固定计划订单,创建)
- graph of planning data, generating(计划数据图形,生成)
- graphical pegging(图形反查)
- horizontal plan, reviewing(展望期计划,复查)
- implementing planned orders(实施计划订单)
- implementing planned orders as firm jobs(将计划订单作为固定任务进行实施)
- implementing repetitive schedules [2](实施重复性计划 [2])
- in supply chain planning(在供应链计划中)
- item planning information, reviewing(项目计划信息,复查)
- net change replan(净更改重新计划)
- onhand quantities, viewing(现有数量,查看)
- online planner(联机计划员)
- planning exceptions messages(计划例外信息)
- planning recommendation, implementing(计划建议,实施)
- replanning net changes(重新计划净更改)
- setting up(设置)
- snapshot data, reviewing(快照数据,复查)
- supply and demand details, reviewing(供应和需求详细资料,复查)
- supply fields(供应字段)
- supply, managing in Supply Chain Planning(供应,在供应链计划中管理)
- using assemblies, reviewing(使用装配件,复查)
- walking up and down a bill of material(上下遍历物料清单)
- Planner Workbench window(计划员工作台窗口)
- Defining Your Display Preferences(定义显示参数选择)
- exception messages, finding(例外信息,查找)
- Implementing Planned Orders(实施计划订单)
- item planning information, finding(项目计划信息,查找)
- item planning information, reviewing(项目计划信息,复查)
- orders, releasing(订单,释放)
- pegged demand, viewing(反查需求,查看)
- pegged supply, viewing(反查供应,查看)
- replanning net changes(重新计划净更改)
- rescheduling scheduled receipts(重新计划预定接收)
- selecting a planner(选择计划员)
- supply and demand, reviewing(供应和需求,复查)
- supply/demand information, finding(供应/需求信息,查找)
- Planners, defining(计划员,定义)
- Planners window, planners, defining(计划员窗口,计划员,定义)
- Planning [2] [3] [4](计划 [2] [3] [4])
- acceptable early days delivery(可接受最早交货天数)
- anchor date(停泊日期)
- append planned orders, in overwrite options(附加计划订单,在改写选项中)
- at aggregate level(在综合层)
- auto-release planned orders(自动释放计划订单)
- auto-release repetitive schedules(自动释放重复性计划)
- batch mode planner(批方式计划员)
- bill of material changes(物料清单更改)
- bills(清单)
- bulk items(散件)
- component yield(组件产出率)
- copying generated plans(复制生成的计划)
- customer inventories (Supply Chain Planning)(客户库存(供应链计划))
- demand classes, with(需求分类,使用)
- demand, past due(需求,过期)
- discrete items with repetitive components(具有重复组件的离散项目)
- discrete vs. repetitive planning(离散对重复性计划)
- DRP plan generation(DRP 计划生成)
- dynamic lead time(动态提前期)
- engineering change orders(工程更改订单)
- engineering change planning(工程更改计划)
- engineering items(工程项目)
- exception sets(例外集)
- exceptions(例外)
- firm order planning(固定计划订单)
- generation(生成)
- from supply, Supply Chain Planning(自供应,供应链计划)
- graphs of supply/demand information, generating(供应/需求的信息图形,生成)
- gross to net explosion(毛需求至净需求展开)
- item planning information, reviewing(项目计划信息,复查)
- launching a supply chain plan [2] [3](启动供应链计划 [2] [3])
- launching an MRP/MPS plan(启动 MRP/MPS 计划)
- logic(逻辑)
- logic, Supply Chain Planning(逻辑,供应链计划)
- lot expirations(批次过期)
- manufactured assemblies(制造的装配件)
- manufacturing lead time(制造提前期)
- memory-based planning engine(基于内存的计划引擎)
- methods(方法)
- methods, Supply Chain Planning(方法,供应链计划)
- MPS plan generation(MPS 计划生成)
- MPS plan generation in Supply Chain Planning(供应链计划中的 MPS 计划生成)
- MRP plan generation [2](MRP 计划生成 [2])
- net subinventories(净子库存)
- netting supply and demand(求净供应和需求)
- onhand quantities, viewing(现有数量,查看)
- online planner(联机计划员)
- organizations, Supply Chain Planning(组织,供应链计划)
- overwrite all, append planned orders, in overwrite options(全部改写,附加计划订单,在改写选项中)
- overwrite none, append planned orders, in overwrite options(无改写,附加计划订单,在改写选项中)
- overwrite options(改写选项)
- overwrite outside planning time fence, append planned orders, in overwrite options(改写外协计划时间栏,附加计划订单,在改写选项中)
- phases(阶段)
- phases of(阶段)
- phases of, under memory-based planning engine(阶段,在基于内存的计划引擎下)
- plan control(计划控制)
- plan generation(计划生成)
- plan generation in Supply Chain Planning(供应链计划中的计划生成)
- plan options, reviewing or adding(计划选项,复查或添加)
- plan options, reviewing or adding in Supply Chain Planning(计划选项,在供应链计划中复查或添加)
- purchased assemblies(采购装配件)
- purpose(用途)
- recommendations, based on item attributes(建议,基于项目属性)
- repetitive [2](重复 [2])
- repetitive items with discrete components(具有离散组件的重复项目)
- repetitive, periods(重复,期间)
- rescheduling non-standard discrete jobs(重新计划非标准离散任务)
- safety stock(安全库存)
- safety stock, Inventory calculation methods(安全库存,库存计算方法)
- safety stock, MRP calculation methods(安全库存,MRP 计算方法)
- scheduled receipts, violating the order of(预定接收,违反订单)
- shrinkage rate(损耗率)
- specifying items to include in plans(指定要包括在计划中的项目)
- supplier planned inventories (Supply Chain Planning)(供应商计划的库存(供应链计划))
- supply and demand detail, reviewing(供应和需求详细资料,复查)
- supply, past due(供应,过期)
- time fence control [2](时间栏控制 [2])
- demand(需求)
- planning(计划)
- release(释放)
- time fence planning(时间栏计划)
- time phasing requirements(分期需求)
- use-up date(用尽日期)
- Planning active [2] [3](活动计划 [2] [3])
- Planning bill forecast [2] [3](计划清单预测 [2] [3])
- Planning bills(计划清单)
- Planning Detail Report(计划明细报表)
- Planning exception sets(计划例外集)
- creating(创建)
- exception time periods(例外时间期)
- excess quantity(过量数量)
- over-utilization(高于利用率)
- repetitive variance(重复差异)
- sensitivity controls(灵敏度控制)
- under-utilization(低于利用率)
- user-defined time fence(自定义时间栏)
- Planning Exception Sets Report(计划例外集报表)
- Planning Exception Sets window(计划例外集窗口)
- planning exception sets, creating(计划例外集,创建)
- planning exception sets, entering sensitivity controls [2](计划例外集,输入灵敏度控制 [2])
- Planning Group QuickCodes window, defining planning group QuickCodes(计划组速查代码窗口,定义计划组速查代码)
- Planning manager(计划管理器)
- forecast consumption(预测冲减)
- importance of(重要性)
- messages(信息)
- processing interval(处理间隔)
- program logic(程序逻辑)
- program requirements(程序需求)
- restarting, after a change to profile options(重新启动,在更改配置文件选项后)
- schedule relief(计划冲减)
- setting up(设置)
- shipment relief(发货冲减)
- starting(启动)
- verification(验证)
- workers(工作流程)
- Planning Manager window(计划管理器窗口)
- Planning Manager Worker(计划管理器工作流程 )
- Planning method, affecting a master schedule load(计划方法,影响主计划装入)
- Planning methods, Supply Chain Planning(计划方法,供应链计划)
- Planning parameters(计划参数)
- Planning Parameters Report(计划参数报表)
- Planning Parameters window(计划参数窗口)
- netting supply and demand(求净供应和需求)
- planning parameters, defining [2](计划参数,定义 [2])
- repetitive planning periods(重复计划期间)
- specifying items for the planning process(指定计划流程项目)
- Planning time fence(计划时间栏)
- Planning time fence control(计划时间栏控制)
- Preferences(参数选择)
- Preferences window(参数选择窗口)
- display preferences, defining(显示参数选择,定义)
- Implementing planned orders(实施计划订单)
- Prerequisites, to kanban planning(前提条件,看板计划)
- Process control(流程控制)
- Processes, Planning Manager Worker(流程,计划管理器工作流程)
- Processing interval(处理间隔)
- Product families(产品系列)
- defined(已定义)
- forecasting(预测)
- Product family(产品系列)
- assigning members to(指定成员至)
- calculating ATP for(计算 ATP)
- consumption for(冲减)
- defining an item as(定义项目作为)
- Product family items, on the master schedule(产品系列项目,在主计划上)
- Production(生产)
- Production forecasts, establishing(生产预测,建立)
- Production planning(生产计划)
- overview of(概览)
- prerequisites to(前提条件)
- Production relief(生产冲减)
- repetitive schedules(重复性计划)
- Profile options(配置文件选项)
- Project Manuacturing(项目制造)
- Project MRP(项目 MRP)
- Project planning, reservation level(项目计划,保留层)
- Projects(项目)
- Projects, Templates Summary window, setting up Project MRP(项目,模板汇总窗口,设置项目 MRP)
- Pull sequence, defined(拉式序列,已定义)
- Purchased assemblies(采购装配件)
- Quantity type, copying/merging forecasts(数量类型,复制/合并预测)
- QuickCodes, planning group(速查代码,计划组)
- ranking sources of supply(对供应来源进行分级)
- Read consistency, memory-based planning engine(读一致性,基于内存的计划引擎)
- Release time fence, Kanban items [2](释放时间栏,看板项目 [2])
- Release time fence control(释放时间栏控制)
- Release window, orders, releasing(释放窗口,订单,释放)
- Relenishment strategies(补充策略)
- Relief process(冲减流程)
- demand classes(需求分类)
- disable, temporarily(禁用,临时)
- production relief [2](生产冲减 [2])
- phantoms(虚拟件)
- repetitive items(重复项目)
- relief information, viewing(冲减信息,查看)
- schedules names, defining(计划名称,定义)
- shipment relief [2](发货冲减 [2])
- Reorder point planning(重新订购点计划)
- Repetetive planning, parameters, defining(重复计划,参数,定义)
- Repetitive items(重复项目)
- auto-release(自动释放)
- in master schedules(在主计划中)
- inside discrete assemblies(在离散装配件中)
- planning time fence control, plan options(计划时间栏控制,计划选项)
- planning time fence control, planning parameters(计划时间栏控制,计划参数)
- production plan monitoring(生产计划监控)
- production relief(生产冲减)
- with discrete components(使用离散组件)
- Repetitive planning(重复性计划)
- acceptable rate changes(可接受的比率更改)
- anchor date [2](停泊日期 [2])
- calculation of optimal rates(计算最优比率)
- component demand(组件需求)
- control(控制)
- discrete items with repetitive components(具有重复组件的离散项目)
- firm repetitive schedules(固定重复性计划)
- implementing repetitive schedules(实施重复性计划)
- order modifiers(订单修改量)
- overrun percent(过剩百分比)
- overview of [2](概览 [2])
- periods, defining(期间,定义)
- planning logic(计划逻辑)
- planning time fence control(计划时间栏控制)
- production relief(生产冲减)
- repetitive items with discrete components(具有离散组件的重复项目)
- repetitive vs. discrete planning(重复对离散计划)
- safety stock(安全库存)
- Repetitive planning periods(重复计划期间)
- horizons(限度)
- period sizes(期间大小)
- special menu(特殊菜单)
- Repetitive schedule, overrun percent(重复性计划,过剩百分比)
- Repetitive schedules(重复性计划)
- Repetitive variance(重复差异)
- Repetitive variance exceptions, planning exception sets, exception time periods(重复差异例外,计划例外集,例外时间期)
- Replenishment source(补充来源)
- Reports(报表)
- Audit Information(审计信息)
- CRP
- Current Projected On Hand vs Projected Available Graphical(当前预计现有量对预计可用图形)
- Demand vs. Replenishment Graphical(需求对补充图形)
- Financial Analysis(财务分析)
- Forecast Comparison Report(预测比较报表)
- Forecast Detail Report(预测明细报表)
- Late Order(延期订单)
- Master Schedule Comparison(主计划比较)
- Master Schedule Detail(主计划详细资料)
- Master Schedule Status [2](主计划状态 [2])
- Order Reschedule(订单重新计划)
- Planned Order(计划订单)
- Planning Detail(计划详细资料)
- Planning Exception Sets(计划例外集)
- Planning Parameters(计划参数)
- Supply Chain Current Projected On Hand vs Projected Available Graphical(供应链当前预计现有量对预计可用图形)
- Supply Chain Demand vs. Replenishment Graphical(供应链需求对补充图形)
- Supply Chain Financial Analysis(供应链财务分析)
- Supply Chain Late Order(供应链延期订单)
- Supply Chain Order Reschedule(供应链订单重新计划)
- Supply Chain Planned Order(供应链计划订单)
- Supply Chain Planning Detail(供应链计划详细资料)
- Requisition load group(请购单装入组)
- Requisitions(请购单)
- dock date(到岸日期)
- how they are created(如何创建它们)
- internal(内部)
- need by date(需要依据日期)
- net purchases(净采购)
- overdue date(过期日期)
- planning dates(计划日期)
- planning time fence ignores(忽略计划时间栏)
- planning time fences(计划时间栏)
- promised by date(按日期承诺)
- receiving inspection inventory(入库检验库存)
- Rescheduling purchase requisitions(重新计划请购单)
- Rescheduling scheduled receipts(重新计划预定接收)
- Reservation level(保留层)
- Reservations, hard(保留,硬)
- Resource shortage exceptions, planning exception sets, exception time periods(资源短缺例外,计划例外集,例外时间期)
- Reviewing source and destination organizations(复查来源和目标组织)
- Rough-cut capacity planning, master scheduling, use in(粗略能力计划,主计划,用于)
- Rounding order quantities(舍入订货数量)
- Routings, standard(工艺路线,标准)
- Safety stock [2](安全库存 [2])
- Sales order demand(销售订单需求)
- Sales orders(销售订单)
- demand class, using to load into master schedules(需求分类,用于装入主计划)
- hard reservations(硬保留)
- master schedule load options(主计划装入选项)
- master schedules, generating(主计划,生成)
- net reservations(净保留)
- soft reservations(软保留)
- Schedule group(计划组)
- Scheduled receipts(预定接收)
- firm scheduled receipts(固定预定接收)
- violating the order of(违反订单)
- Scheduling processes, two-level master scheduling(计划流程,双层主计划)
- Second bucket days(第二时段天数)
- Second horizon(第二限度)
- Seiban planning(Seiban 计划)
- Sensitivity controls(灵敏度控制)
- Setting up(设置)
- auto-release planned orders(自动释放计划订单)
- capacity planning(能力计划)
- demand classes, creating(需求分类,创建)
- distribution requirements plans(分配需求计划)
- forecast sets(预测集)
- forecasts(预测)
- graphical pegging [2](图形反查 [2])
- master production schedules(主生产计划)
- master schedules(主计划)
- material requirements plans(物料需求计划)
- memory-based planning engine [2](基于内存的计划引擎 [2])
- net change replan(净更改重新计划)
- organization, changing(组织,更改)
- planner(计划员)
- Planner Workbench(计划员工作台)
- planners, defining(计划员,定义)
- planning exeption sets, creating(计划例外集,创建)
- planning manager(计划管理器)
- planning manager, starting(计划管理器,启动)
- planning parameters, defining(计划参数,定义)
- project MRP(项目 MRP)
- defining planning group QuickCodes(定义计划组速查代码)
- project planning(项目计划)
- Seiban planning(Seiban 计划)
- snapshot(快照)
- source lists(来源清单)
- supply chain master production schedules(供应链主生产计划)
- supply chain material requirements plans(供应链物料需求计划)
- Supply Chain Planning(供应链计划)
- Setup(设置)
- Ship-to address, consume forecasts by(发运目的地地址,冲减预测依据)
- Shipment relief(发货冲减)
- Shipping method [2](装运方法 [2])
- Shortage exceptions, planning exception sets, exception time periods(短缺例外,计划例外集,例外时间期)
- Shrinkage rate(损耗率)
- additional demand, calculating(附加需求,计算)
- Simulate forecasts(模拟预测)
- Simulation(模拟)
- Simulation set, plan organizations(模拟集,计划组织)
- Simulations, with capacity planning(模拟,使用能力计划)
- Snapshot(快照)
- Snapshot data(快照数据)
- enterprise view, displaying(企业视图,显示)
- horizontal plan, reviewing(展望期计划,复查)
- reviewing(复查)
- Snapshot lock tables(快照加锁表)
- Snapshot Monitor Process logic(快照监控流程逻辑)
- Soft pegging level(软反查层)
- Source flag, master schedule entries, tracking(来源标志,主计划条目,跟踪)
- Source List window, source lists, creating(来源清单窗口,来源清单,创建)
- Source lists(来源清单)
- Source type, copying/merging forecasts(来源类型,复制/合并预测)
- Source types(来源类型)
- Sources window, Reviewing source organizations(来源窗口,复查来源组织)
- Sourcing(来源)
- sourcing percentages(来源百分比)
- Sourcing rule(来源规则)
- Sourcing Rule window, Defining a Sourcing Rule(来源规则窗口,定义来源规则)
- Sourcing Rule/Bill of Distribution Assignments window(来源规则/分配清单指定窗口)
- Sourcing Rule/Bill of Distribution window, Assigning Sourcing Rules and Bills of Distribution(来源规则/分配清单窗口,指定来源规则和分配清单)
- Sourcing rules(来源规则)
- Sourcing Rules window(来源规则窗口)
- Sourcing strategies(来源策略)
- Sourcing types(来源类型)
- Special menu(特殊菜单)
- display preferences, defining(显示参数选择,定义)
- Implementing planned orders(实施计划订单)
- Standard bills(标准清单)
- Standard planning engine, launching an MPS/MRP plan(标准计划引擎,启动 MPS/MRP 计划)
- Standard routings(标准工艺路线)
- Statistical forecast, forecast rules, defining(统计预测,预测规则,定义)
- Statistical forecasts(统计预测)
- Subinventories(子库存)
- defining in Inventory(在库存中定义)
- netting(求净)
- netting by demand class(按需求分类求净)
- netting, Supply Chain Planning(求净,供应链计划)
- onhand quantities, viewing(现有数量,查看)
- Subinventories Summary folder window, defining project information in subinventories(子库存汇总文件夹窗口,定义子库存中的项目信息)
- Subinventories window, defining project information in subinventories(子库存窗口,定义子库存中的项目信息)
- Subinventory, for a kanban item(子库存,用于看板项目)
- Subinventory netting, demand class, by(子库存净数,需求分类,按)
- Subinventory Netting window(子库存净数窗口)
- coordinate records with Plan Options window(使用计划选项窗口协调记录)
- Supply Chain Planning(供应链计划)
- netting subinventories(求净子库存)
- netting supply and demand, Supply Chain Planning(求净供应和需求,供应链计划)
- Suggested aggregate repetitive schedule(建议的总重复性计划)
- Suggested repetitive schedule(建议的重复性计划)
- Suppliers, modelling external supplier inventories(供应商,模拟外部供应商库存)
- Supply(供应)
- fields(字段)
- graphical pegging for an item(项目的图形反查)
- graphs of, generating(图形,生成)
- managing in Supply Chain Planning(供应链计划中的管理)
- netting(求净)
- netting, Supply Chain Planning(求净,供应链计划)
- past due(过期)
- repetitive schedules as planned supply(作为计划供应的重复性计划)
- reviewing details(复查详细资料)
- schedules, in Supply Chain Planning(计划,在供应链计划中)
- Supply Chain ATP(供应链 ATP)
- Supply Chain Current Projected On Hand vs Projected Available Graphical Report(供应链当前预计现有量对预计可用图形报表)
- Supply Chain Demand vs. Replenishment Graphical Report(供应链需求对补充图形报表)
- Supply Chain Financial Analysis Report(供应链财务分析报表)
- Supply Chain Late Order Report(供应链延期订单报表)
- Supply Chain Master Schedule Status Report(供应链主计划状态报表)
- Supply chain master schedules(供应链主计划)
- Supply Chain Order Reschedule Report(供应链重新计划订单报表)
- Supply Chain Planned Order Report(供应链计划订单报表)
- Supply chain planning [2](供应链计划 [2])
- adding firm planned orders for net change replan(添加净更改重新计划的固定计划订单)
- append planed orders(附加计划订单)
- Assignment sets(指定集)
- bills of distribution(分配清单)
- compare Planned Items options in DRP, MPS, and MRP(比较 DRP、MPS 和 MRP 中的计划项目选项)
- decentralized planning(分散的计划)
- defining an MPS name(定义 MPS 名称)
- demand schedules(需求计划)
- demand time fence control(需求时间栏控制)
- demand, in Planner Workbench(需求,计划员工作台中)
- displaying an indented bill(显示多级清单)
- displaying an indented where used(显示各级清单使用处)
- DRP names, defining(DRP 名称,定义)
- DRP plan generation(DRP 计划生成)
- DRP planning methods(DRP 计划方法)
- enterprise view, displaying(企业视图,显示)
- external customer inventories, modelling(外部客户库存,模拟)
- external supplier inventories, modelling(外部供应商库存,模拟)
- generating dependent demand(生成需求相关)
- included items in a DRP plan(DRP 计划中的包括项目)
- included items in an MPS plan(MPS 计划中的包括项目)
- included items in an MRP plan(MRP 计划中的包括项目)
- interorg planned orders(组织间计划订单)
- interorganization planned orders [2](组织间计划订单 [2])
- launching a plan(启动计划)
- loading an MPS from an internal source(从内部来源装入 MPS)
- main features(主要特性)
- master schedules(主计划)
- loading from multiple sources(从多个来源装入)
- MPS and DRP planning methods(MPS 和 DRP 计划方法)
- MRP and DRP planning methods(MRP 和 DRP 计划方法)
- MRP names, defining(MRP 名称,定义)
- MRP plan generation(MRP 计划生成)
- MRP planning methods(MRP 计划方法)
- multiple organizations(多个组织)
- netting subinventories(求净子库存)
- netting supply and demand(求净供应和需求)
- organization selection(组织选择)
- overwrite options(改写选项)
- plan generation(计划生成)
- plan options, reviewing or adding(计划选项,复查或添加)
- plan organizations(计划组织)
- planned items and components(计划项目和组件)
- planned orders, assigning(计划订单,指定)
- planner workbech(计划员工作台)
- planning logic(计划逻辑)
- planning methods(计划方法)
- planning process(计划流程)
- planning time fence control(计划时间栏控制)
- Reviewing source and destination organizations(复查来源和目标组织)
- setting up sourcing strategies(设置来源策略)
- snapshot lock tables(快照加锁表)
- sourcing rules(来源规则)
- sourcing strategies(来源策略)
- specifying items for the supply chain planning process(指定供应链计划流程的项目)
- supply schedules(供应计划)
- supply, in Planner Workbench(供应,在计划员工作台中)
- viewing the sourcing assignment heirarchy(查看来源指定层次结构)
- Supply Chain Planning Detail Report(供应链计划明细报表)
- Supply Days, order modifier(供应天数,订单修改量)
- Supply schedule items, planned items options, supply chain plan options(供应计划项目,计划项目选项,供应链计划选项)
- Supply source, choosing the best(供应来源,选择最佳)
- Supply window(供应窗口)
- Supply/Demand window(供应/需求窗口)
- Third bucket days(第三时段天数)
- Time buckets(时段)
- bucketed information, reviewing(分时段信息,复查)
- forecasts(预测)
- mixed, in forecast consumption(混合,在预测冲减中)
- Time fence(时间栏)
- control(控制)
- demand(需求)
- establishing(建立)
- loading master schedules(装入主计划)
- maintaining master schedule(维护主计划)
- monitoring the production plan(监控生产计划)
- planning(计划)
- planning process(计划流程)
- release(释放)
- definition of(定义)
- demand(需求)
- master schedule load options(主计划装入选项)
- plan options(计划选项)
- planning parameters(计划参数)
- supply chain plan options(供应链计划选项)
- examples of time fence planning(时间栏计划的实例)
- firm planned orders(固定计划订单)
- for items, defining(用于项目,定义)
- planning(计划)
- planning, overview(计划,概览)
- release(释放)
- requisitions(请购单)
- Time phasing requirements(分时段需求)
- Time-phased make-buy planning(分时段制造 - 采购计划)
- Tracking(跟踪)
- master schedule entries(主计划条目)
- model bill forecasts(模型清单预测)
- Transfer from(传送自)
- Two-level master scheduling(双层主计划)
- bill definition(清单定义)
- configurations as standard items(作为标准项目的配置)
- definition of(定义)
- demand, types of in forecast control(需求,预测控制中的类型)
- demand, types of in master demand schedules(需求,主需求计划中的类型)
- establising production forecast(建立生产预测)
- example of a bill of material(物料清单实例)
- forecasts(预测)
- item definition(项目定义)
- model(模型)
- model bill(模型清单)
- model bills(模型清单)
- option class(选项类)
- option class bill(选项类清单)
- option class bills(选项类清单)
- pick-to-order models(按订单挑库模型)
- planning bill [2](计划清单 [2])
- planning item(计划项目)
- product family item(产品系列项目)
- production forecast, establishing(产品预测,建立)
- scheduling processes(计划流程)
- scheduling processes, in forecast control(计划流程,在预测控制中)
- standard item(标准项目)
- Unconsumption of forecasts(取消预测的冲减)
- Under-utilization(低于利用率)
- Units of measure, affecting master schedule loads(计量单位,影响主计划装入)
- Use up information(用完信息)
- Use-up date(用完日期)
- User profiles(用户配置文件)
- User-defined time fence, planning exception sets(自定义时间栏,计划例外集)
- Using assemblies, reviewing(使用装配件,复查)
- Utilization percentage, viewing per resource(利用率百分比,查看每个资源)
- Variance, between simulation and production plans(差异,在模拟和生产计划之间)
- View Bill of Distribution window, Viewing bills of distribution(查看分配清单窗口,查看分配清单)
- View Bills of Distribution window, view bills of distribution(查看分配清单窗口,查看分配清单)
- View On Hand Quantities window, onhand quantities, viewing(查看现有数量窗口,现有数量,查看)
- View Sourcing Rule window(查看来源规则窗口)
- View Supply Chain Bill window(查看供应链清单窗口
- displaying an indented bill(显示多级清单)
- Displaying an indented where used(显示各级清单使用处)
- viewing the sourcing assignment heirarchy(查看来源指定层次结构)
- Viewing end demand, plan options for(查看终止需求,计划选项)
- Viewing the sourcing assignment heirarchy(查看来源指定层次结构)
- Weekly buckets, forecast consumption(周时段,预测冲减)
- What-if scenarios, testing(假设分析方案,测试)
- Where Used window, using assemblies, reviewing(使用处窗口,使用装配件,复查)
- Window, Find, search strings, entering(窗口,查找,搜索字符串,输入)
- Windows(窗口)
- Bill of Material(物料清单)
- Bill of Materials Parameters(物料清单参数)
- Components(组件)
- Copy/Merge Forecasts(复制/合并预测)
- Define Bill of Material window(定义物料清单窗口)
- Define Items window(定义项目窗口)
- Define Repetitive Assembly(定义重复装配件)
- Demand(需求)
- Demand Class QuickCodes(需求分类速查代码)
- DRP Names(DRP 名称)
- defining(定义)
- enabling the memory-based planning engine(启用基于内存的计划引擎)
- time fence control(时间栏控制)
- End Assemblies(总装)
- Engineering Change Order(工程更改订单)
- Exception Summary [2](例外汇总 [2])
- Exceptions(例外)
- Find(查找)
- Find Exceptions(查找例外)
- Find Items(查找项目)
- Find Items folder window(查找项目文件夹窗口)
- Find Supply/Demand(查找供应/需求)
- folder windows(文件夹窗口)
- Find Exceptions(查找例外)
- Find Items(查找项目)
- Find Supply(查找供应)
- Find Supply/Demand [2](查找供应/需求 [2])
- Forecast Items(预测项目)
- Items(项目)
- Master Demand Schedule Items(主需求计划项目)
- Master Production Schedule Items(主生产计划项目)
- Supply(供应)
- Supply/Demand(供应/需求)
- Forecast Bucketed Entries(预测时段条目)
- Forecast Entries(预测条目)
- forecast entries, displaying(预测条目,显示)
- Forecast Items(预测项目)
- Forecast Sets(预测集)
- Forecasts Sets(预测集)
- forecast sets, disabling(预测集,禁用)
- Generate Forecast(生成预测)
- Horizontal Plan(展望期计划)
- reviewing the horizontal plan(复查展望期计划)
- Items(项目)
- Items window(项目窗口)
- Launch Copy Plan(启动复制计划)
- Launch DRP(启动 DRP)
- Launch MPS(启动 MPS)
- Supply Chain Planning(供应链计划)
- Launch MPS window(启动 MPS 窗口)
- Launch MRP(启动 MRP)
- Load/Copy/Merge Forecast(装入/复制/合并预测)
- Load/copy/merge MDS(装入/复制/合并 MDS)
- Load/copy/merge MPS(装入/复制/合并 MPS)
- Master Demand Schedule Entries(主需求计划条目)
- Master Demand Schedule Items(主需求计划项目)
- Master Demand Schedules(主需求计划)
- disabling(禁用)
- enabling the memory-based planning engine(启用基于内存的计划引擎)
- entries, defining manually(条目,人工定义)
- Master Item(项目主组织)
- Master Production Schedule Entries(主生成计划条目)
- Master Production Schedule Items(主生产计划项目)
- Master Production Schedules(主生产计划)
- MDS Entries(MDS 条目)
- MDS Items(MDS 项目)
- MDS Names(MDS 名称)
- disabling(禁用)
- enabling the memory-based planning engine(启用基于内存的计划引擎)
- entries, defining manually(条目,人工定义)
- MDS Reliefs(MDS 冲减)
- MPS Entries(MPS 条目)
- MPS Items(MPS 项目)
- MPS Names(MPS 名称)
- MPS Reliefs(MPS 冲减)
- MRP Names(MRP 名称)
- defining(定义)
- defining, in Supply Chain Planning(定义,在供应链计划中)
- enabling the memory-based planning engine(启用基于内存的计划引擎)
- time fence control(时间栏控制)
- Online Planner Status(联机计划员状态)
- orders, releasing(订单,释放)
- Organization Parameters(组织参数)
- Parameters(参数)
- paths to(路径)
- Plan Options(计划选项)
- Plan Organizations(计划组织)
- plan options, reviewing or adding to organizations(计划选项,复查或添加至组织)
- Plan Status(计划状态)
- Planner Workbench(计划员工作台)
- Planners(计划员)
- Planning Exception Sets(计划例外集)
- Planning Group QuickCodes(计划组速查代码)
- Planning Manager(计划管理器)
- Planning Parameters(计划参数)
- defining(定义)
- netting supply and demand(求净供应和需求)
- specifying items for the planning process(指定计划流程项目)
- Preferences(参数选择)
- Projects, Templates Summary window(项目,模板汇总窗口)
- Subinventories(子库存)
- Subinventories Summary folder(子库存汇总文件夹)
- Subinventory Netting(子库存净数)
- coordinate records with Plan Options window, Supply Chain Planning(使用计划选项窗口协调记录,供应链计划)
- netting subinventories(求净子库存)
- netting supply and demand, Supply Chain Planning(求净供应和需求,供应链计划)
- Supply(供应)
- Supply/Demand(供应/需求)
- Supply/Demand window(供应/需求窗口)
- View On Hand Quantities window(查看现有数量窗口)
- Where Used(使用处)
- WIP Material Transactions(WIP 物料事务处理)
- Work Dates(工作日期)
- WIP
- WIP Material Transactions window, net WIP(WIP 物料事务处理窗口,净 WIP)
- Work dates(工作日期)
- affecting master schedule loads(影响主计划装入)
- calendar periods used in Planner Workbench(在计划员工作台中使用的日历期间)
- master demand schedules(主需求计划)
- master production schedules(主生产计划)
- master schedules, importing from outside sources(主计划,从外部来源导入)
- material requirements plans(物料需求计划)
- planning parameters(计划参数)
- repetitive planning periods(重复计划期间)
- special menu(特殊菜单)
- Work Dates window, workday calendar, reviewing(工作日期窗口,工作日日历,复查)
- Work in process(在制品)
- Workers(工作流程)
- Yield, component(产出率,组件)